Takes stock of SMC functioning
SRINAGAR, SEPTEMBER 17: The
Advisor to Governor B B Vyas today directed the officers of the Power
Development Department (PDD) to come up with a concrete roadmap for providing
uninterrupted power supply in Srinagar and Jammu cities.
The Advisor was speaking at a meeting convened to review overall power
scenario and status of various developmental projects aimed at augmenting power
infra in the state.
The Advisor also discussed the issues projected by different delegations
during public outreach programme.
The meeting was attended by Commissioner Secretary PDD Hirdesh Kumar,
Chief Engineers of various wings and other senior officers of the department.
Seeking detailed status of various ongoing schemes and projects for
strengthening the power infrastructure in the state, the Advisor directed for
capacity building, filling demand–supply gap and keeping its inventory in every
area.
He also called for status of power sector viz viz availability,
transmission and distribution in the state particularly in the Srinagar and
Jammu cities.
To expedite the process of completion of various flagship programmes in
power sector, the Advisor also directed the officers to follow a timeline of
works on weekly basis.
Vyas also directed for conducting detailed profiling of human resource
engaged in various wings and projects of the department. He also stressed on
expediting the regularization process of daily wagers employed in different
wings of PDD, besides service issues of draftsmen regarding consideration of
degree and diploma
For addressing the stagnation issue of employees in the department, Vyas
observed that a committee should be formed for settling the service matters
expeditiously.
Meanwhile, Advisor Vyas also convened a meeting of Srinagar Municipal
Corporation (SMC) which was attended by the Commissioner SMC and other senior
officers.
The meeting discussed in detail urban drainage projects of the Srinagar
city, number of developmental projects which have been left and which measures
needed to fill the critical gaps.
The Advisor directed the officers to undertaking measures for ensuring
that the developmental projects are completed as soon as possible so that the
people do not suffer for the lack of civic and other related amenities and
facilities. He said that the officers should also project the funding gap of
lingering projects to the concerned quarters so that they get completed at
earliest.
He also stressed on the need to be pro-active to the people’s grievances
and demands of the public and officers should be designated to look after
grievances of all areas.
Post A Comment:
0 comments so far,add yours