Mumbai, Feb 24: Sadbhav Engineering Ltd said that company has been declared the successful bidder (L1) by National Highway Authority of India (NHAI) for the project/works on EPC Mode.
The scope of the project is for construction of NH-24
extension 4-lane bypass starting from Behta Road and terminating at
Sitapur Road Chainage 479.500 (bypass chainage from km 32.000 /
31.490 to km 64.900/64.380 - average length 32.895 km) in the State of
Uttar Pradesh under NHDP Phase-VII-Package 2" on EPC mode.,
compnay said
in a filing with BSE.
The construction period is 3 years. UNI
in a filing with BSE.
The construction period is 3 years. UNI
Post A Comment:
0 comments so far,add yours